Client: JV between China’s Camc Engineering and Turkey’s IC Içtaş Construction
Contractor: SOCAR AQS
Location: Tuz Golu area, Aksaray region, Turkey
Scope of work: Tuzgolu Underground Gas Storage Drilling Works include 40 caverns with total depth of 62.000 meters, 1.550 meters for each.